公告摘要
项目编号-
预算金额-
招标公司-
招标联系人-
标书截止时间-
投标截止时间-
公告正文

{"success":true,"data":{"bd":{"bdName":"振业天成项目变配电及发电机工程","bdBH":"231UA1013471/01","zbwjIsSell":"0","yswjIsSell":"0","ysWJHuoQuStartTime":,"ysWJHuoQuEndTime":,"zbWJHuoQuStartTime":1675926000000,"zbWJHuoQuEndTime":1676539800000,"zbWJZhiYiEndTime":1676626200000,"ysWJZhiYiEndTime":,"zbWJDaYiEndTime":1677060000000,"tbWJDiJiaoEndTime":1677720600000,"ysWJDaYiEndTime":,"sqWJDiJiaoEndTime":,"ysKaiQiTime":,"yswjbsJinE":0,"zbwjbsJinE":0,"shouBiaoDiDian":"深圳阳光采购平台","kbTime":1677720600000,"dayLimit":285,"kbDiDian":"深圳阳光采购平台","isBaoMing":0,"bmStartTime":1675926000000,"bmEndTime":1676358000000,"dayLimitShuoMing":"本招标工程暂定工期为:2023年3月15日(暂定),完成日期:2023年12月30日n(具体开工时间以招标人通知为准)n1)接到甲方、监理进场通知后7天内人员进场配合;n2)投标方理解现场施工对本招标工程施工区域、施工顺序、施工相关节点的影响。并承诺,在投标阶段已经充分考虑施工区域的调整、交叉施工对工期影响的风险并已经采取积极措施,保证按招标/合同约定工期、质量要求移交交付物。n3)中标单位须与本项目其他施工单位协调,使有关的安装能配合工程进度。因缺少沟通协调而造成的一切后果如延误工期等,将由中标单位负责。n注:a、以上完成交货日期已经包含中标单位前期人力、材料、设备等准备周期;nb、 以上工期为合格工程完成日期,已含检测/不合格处理/验收等所有时间;nc、工期已含节假日、阴雨天、前期准备时间,台风、地震等不可抗拒的因素除外。n2、工期管理要求:n1)招标方可根据现场工程进展实际状况,对施工工期做调整。投标方须无条件配合、执行,并按照有关约定按期、保质的完成施工任务。对本项目工期要求的任一节点完成时间,中标单位每拖延一天,则应针对该节点承担违约金¥2000元/天处罚,招标方有权从当月进度款项中直接扣除。n2)要求中标单位在收到中标通知7天内上报详细的施工组织设计、施工进度计划(人、机、料等)分项技术方案和安全文明施工方案不按时报该计划中标方应支付招标方违约金2000元/天。n 3)由于现场施工作业面的限制,招标方可能不能一次性提交所有招标范围内作业面,投标单位须根据现场的实际情况,及时调整平面布置以及人、机、料的安排,以确保竣工日期目标的实现,中标方不应就此提出任何的工期及费用索偿。同时,招标方要求的总进度计划并不完全保证中标单位能按所定的进度计划连续不断的施工,假若因实际施工情况而需要对有关进度计划作出修改时,承包单位须予以配合及不能为此而作出任何的索赔。n 4)中标单位应在任何阶段与其他承包单位紧密配合,尤其是销售中心、入户大堂、电梯前室等等部位。同时,在整个施工过程中应按实际情况及考虑其他承包单位或专业承包单位的施工计划不断修订其工作进度计划以配合。如因中标单位未能按时完工,延误了其他相关施工单位的进场时间及机械人工的闲置,由中标单位负责向相关单位赔偿费用并给予2000到20000元处罚,造成节点工期滞后的由招标方按上述1)规定对中标单位进行处理;n5)中标单位需在中标后一个月内完成供电规划、供电方案报批报建;中标单位需在中标后一个月内完成配电图纸深化设计并取得政府职能部门(供电局)审查通过文件;因中标单位未能按时完工,中标方应支付招标方违约金2000元/天。","zbFanWei":"1.1招标文件清单n1)招标书、施工图纸、工程量清单;n2)招标人提供的《振业天成项目变配电深化设计图》。n3)招标人提供的由深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》。n1.2招标范围n1)招标图纸《振业天成项目变配电深化设计图》。n2)深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》n具体详见招标文件。","ziZhiYaoQiu":"(1)投标人是在中华人民共和国境内注册并合法运作的独立法人机构或者其他组织,需提供营业执照的扫描件。n(2)投标人具有电力监管部门颁发的承装(修、试)电力设施许可证五级或以上资质,提供证书扫描件。n(3)投标人拟派本项目的项目经理应具有机电工程专业一级建造师资格证书,且无在建项目;特别提醒:投标文件项目经理必须在施工现场办公,并对整个项目施工全过程进行管控,不接受任何与投标文件不相符的项目经理。提供证书扫描件。n(4)投标人具有建设主管部门颁发的《安全生产许可证》,提供证书扫描件。 n(5)投标人2019年1月1日起至投标截止日止有承接过合同金额1000万元或以上新建住宅小区或商业变配电工程,提供体现上述内容的合同关键页扫描件,以合同签订日期为准,如合同无法证明规模或工程类型的,需补充提供其他证明材料,否则不予认可。n(6)本次招标不接受联合体投标。n(7)单位负责人为同一人或者存在控股、管理关系的不同单位,不得参加同一标段投标或者未划分标段的同一招标项目投标,否则相关投标均无效。n(8)投标人因违反工程建设法律法规和安全生产管理规定而受到建设行政主管部门红色警示的企业,在红色警示期间,或者近三年在政府诚信类平台有不良行为记录者,将不被接受参与本次投标工程投标,提供承诺函。","isJieShouLianHeTi":false,"jiaoYiLiuCheng":"1","gsjBaoJiaFangShi":1,"pbBanFa":2,"yaoQingFlag":1,"purchaseControlPriceExplain":,"purchaseControlFileList":,"isDuiWaiShowGsj":1,"bdHeTongGuJia":2863100000.00,"kaiBiaoXingShi":"1","zgsqWjOpenMethod":"1","zgsqWjSubmitMethod":"1","tbwjSubmitMethod":"1","isPayBaoZhengJin":1,"bzjJineBili":,"isPingDingFenLiUsed":1,"dbBanFa":10,"lianHeTiYaoQiu":"","jingJiaLeiXing":0,"yanShiFangShi":,"yanShiShiChang":0,"yanShiZongShiChang":0,"isQiPaiJiaExists":1,"qiPaiJia":0,"jiaGeTiDu":0,"isShowBaojia":,"isShowZuiDiJia":,"jingJiaXingShi":1,"isBiaoShuBianZhi":1,"jingJiaStartTime":,"jingJiaEndTime":,"sysPlatformCode":},"ggDetail":{"guid":"812473a4-9b2e-4208-adb3-0df5e59663fb","ggLeiXing":1,"title":"{"success":true,"data":{"bd":{"bdName":"振业天成项目变配电及发电机工程","bdBH":"231UA1013471/01","zbwjIsSell":"0","yswjIsSell":"0","ysWJHuoQuStartTime":,"ysWJHuoQuEndTime":,"zbWJHuoQuStartTime":1675926000000,"zbWJHuoQuEndTime":1676539800000,"zbWJZhiYiEndTime":1676626200000,"ysWJZhiYiEndTime":,"zbWJDaYiEndTime":1677060000000,"tbWJDiJiaoEndTime":1677720600000,"ysWJDaYiEndTime":,"sqWJDiJiaoEndTime":,"ysKaiQiTime":,"yswjbsJinE":0,"zbwjbsJinE":0,"shouBiaoDiDian":"深圳阳光采购平台","kbTime":1677720600000,"dayLimit":285,"kbDiDian":"深圳阳光采购平台","isBaoMing":0,"bmStartTime":1675926000000,"bmEndTime":1676358000000,"dayLimitShuoMing":"本招标工程暂定工期为:2023年3月15日(暂定),完成日期:2023年12月30日n(具体开工时间以招标人通知为准)n1)接到甲方、监理进场通知后7天内人员进场配合;n2)投标方理解现场施工对本招标工程施工区域、施工顺序、施工相关节点的影响。并承诺,在投标阶段已经充分考虑施工区域的调整、交叉施工对工期影响的风险并已经采取积极措施,保证按招标/合同约定工期、质量要求移交交付物。n3)中标单位须与本项目其他施工单位协调,使有关的安装能配合工程进度。因缺少沟通协调而造成的一切后果如延误工期等,将由中标单位负责。n注:a、以上完成交货日期已经包含中标单位前期人力、材料、设备等准备周期;nb、 以上工期为合格工程完成日期,已含检测/不合格处理/验收等所有时间;nc、工期已含节假日、阴雨天、前期准备时间,台风、地震等不可抗拒的因素除外。n2、工期管理要求:n1)招标方可根据现场工程进展实际状况,对施工工期做调整。投标方须无条件配合、执行,并按照有关约定按期、保质的完成施工任务。对本项目工期要求的任一节点完成时间,中标单位每拖延一天,则应针对该节点承担违约金¥2000元/天处罚,招标方有权从当月进度款项中直接扣除。n2)要求中标单位在收到中标通知7天内上报详细的施工组织设计、施工进度计划(人、机、料等)分项技术方案和安全文明施工方案不按时报该计划中标方应支付招标方违约金2000元/天。n 3)由于现场施工作业面的限制,招标方可能不能一次性提交所有招标范围内作业面,投标单位须根据现场的实际情况,及时调整平面布置以及人、机、料的安排,以确保竣工日期目标的实现,中标方不应就此提出任何的工期及费用索偿。同时,招标方要求的总进度计划并不完全保证中标单位能按所定的进度计划连续不断的施工,假若因实际施工情况而需要对有关进度计划作出修改时,承包单位须予以配合及不能为此而作出任何的索赔。n 4)中标单位应在任何阶段与其他承包单位紧密配合,尤其是销售中心、入户大堂、电梯前室等等部位。同时,在整个施工过程中应按实际情况及考虑其他承包单位或专业承包单位的施工计划不断修订其工作进度计划以配合。如因中标单位未能按时完工,延误了其他相关施工单位的进场时间及机械人工的闲置,由中标单位负责向相关单位赔偿费用并给予2000到20000元处罚,造成节点工期滞后的由招标方按上述1)规定对中标单位进行处理;n5)中标单位需在中标后一个月内完成供电规划、供电方案报批报建;中标单位需在中标后一个月内完成配电图纸深化设计并取得政府职能部门(供电局)审查通过文件;因中标单位未能按时完工,中标方应支付招标方违约金2000元/天。","zbFanWei":"1.1招标文件清单n1)招标书、施工图纸、工程量清单;n2)招标人提供的《振业天成项目变配电深化设计图》。n3)招标人提供的由深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》。n1.2招标范围n1)招标图纸《振业天成项目变配电深化设计图》。n2)深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》n具体详见招标文件。","ziZhiYaoQiu":"(1)投标人是在中华人民共和国境内注册并合法运作的独立法人机构或者其他组织,需提供营业执照的扫描件。n(2)投标人具有电力监管部门颁发的承装(修、试)电力设施许可证五级或以上资质,提供证书扫描件。n(3)投标人拟派本项目的项目经理应具有机电工程专业一级建造师资格证书,且无在建项目;特别提醒:投标文件项目经理必须在施工现场办公,并对整个项目施工全过程进行管控,不接受任何与投标文件不相符的项目经理。提供证书扫描件。n(4)投标人具有建设主管部门颁发的《安全生产许可证》,提供证书扫描件。 n(5)投标人2019年1月1日起至投标截止日止有承接过合同金额1000万元或以上新建住宅小区或商业变配电工程,提供体现上述内容的合同关键页扫描件,以合同签订日期为准,如合同无法证明规模或工程类型的,需补充提供其他证明材料,否则不予认可。n(6)本次招标不接受联合体投标。n(7)单位负责人为同一人或者存在控股、管理关系的不同单位,不得参加同一标段投标或者未划分标段的同一招标项目投标,否则相关投标均无效。n(8)投标人因违反工程建设法律法规和安全生产管理规定而受到建设行政主管部门红色警示的企业,在红色警示期间,或者近三年在政府诚信类平台有不良行为记录者,将不被接受参与本次投标工程投标,提供承诺函。","isJieShouLianHeTi":false,"jiaoYiLiuCheng":"1","gsjBaoJiaFangShi":1,"pbBanFa":2,"yaoQingFlag":1,"purchaseControlPriceExplain":,"purchaseControlFileList":,"isDuiWaiShowGsj":1,"bdHeTongGuJia":2863100000.00,"kaiBiaoXingShi":"1","zgsqWjOpenMethod":"1","zgsqWjSubmitMethod":"1","tbwjSubmitMethod":"1","isPayBaoZhengJin":1,"bzjJineBili":,"isPingDingFenLiUsed":1,"dbBanFa":10,"lianHeTiYaoQiu":"","jingJiaLeiXing":0,"yanShiFangShi":,"yanShiShiChang":0,"yanShiZongShiChang":0,"isQiPaiJiaExists":1,"qiPaiJia":0,"jiaGeTiDu":0,"isShowBaojia":,"isShowZuiDiJia":,"jingJiaXingShi":1,"isBiaoShuBianZhi":1,"jingJiaStartTime":,"jingJiaEndTime":,"sysPlatformCode":},"ggDetail":{"guid":"812473a4-9b2e-4208-adb3-0df5e59663fb","ggLeiXing":1,"title":"振业天成项目变配电及发电机工程公开招标采购公告","publishTime":1675923153665,"faBuMeiTi":"深圳阳光采购平台,中国招投标公共服务平台","ggStartTime":1675926000000,"ggNeiRong":"本项目为评审方法为定性评审法,采用两阶段开标方式。第一阶段开标:资格审查文件、商务标和技术标;第二阶段开价格标,在完成投标文件的资格审查文件、商务标和技术标评审后进行。 因招标平台无上述评审方式,相关评审办法及评审程序以本项目招标文件相关要求为准,招标平台、招标公告、定标系统中的“综合评估法”均不适用。 监督举报电话:0755-22965602、0755-86660475 温馨提示:保证金将按原汇款途径退回,我司不会以任何名义要求投标人将保证金汇至招标文件指定账户以外的任何账号,谨防诈骗。","externalJianDuUser":"","externalJianDuPhone":"","fileName":,"fileUrl":,"fileList":,"url":,"zbBdVoList":[{"bdName":"振业天成项目变配电及发电机工程","bdBH":"231UA1013471/01","zbwjIsSell":"0","yswjIsSell":"0","ysWJHuoQuStartTime":,"ysWJHuoQuEndTime":,"zbWJHuoQuStartTime":1675926000000,"zbWJHuoQuEndTime":1676539800000,"zbWJZhiYiEndTime":1676626200000,"ysWJZhiYiEndTime":,"zbWJDaYiEndTime":1677060000000,"tbWJDiJiaoEndTime":1677720600000,"ysWJDaYiEndTime":,"sqWJDiJiaoEndTime":,"ysKaiQiTime":,"yswjbsJinE":0,"zbwjbsJinE":0,"shouBiaoDiDian":"深圳阳光采购平台","kbTime":1677720600000,"dayLimit":285,"kbDiDian":"深圳阳光采购平台","isBaoMing":0,"bmStartTime":1675926000000,"bmEndTime":1676358000000,"dayLimitShuoMing":"本招标工程暂定工期为:2023年3月15日(暂定),完成日期:2023年12月30日n(具体开工时间以招标人通知为准)n1)接到甲方、监理进场通知后7天内人员进场配合;n2)投标方理解现场施工对本招标工程施工区域、施工顺序、施工相关节点的影响。并承诺,在投标阶段已经充分考虑施工区域的调整、交叉施工对工期影响的风险并已经采取积极措施,保证按招标/合同约定工期、质量要求移交交付物。n3)中标单位须与本项目其他施工单位协调,使有关的安装能配合工程进度。因缺少沟通协调而造成的一切后果如延误工期等,将由中标单位负责。n注:a、以上完成交货日期已经包含中标单位前期人力、材料、设备等准备周期;nb、 以上工期为合格工程完成日期,已含检测/不合格处理/验收等所有时间;nc、工期已含节假日、阴雨天、前期准备时间,台风、地震等不可抗拒的因素除外。n2、工期管理要求:n1)招标方可根据现场工程进展实际状况,对施工工期做调整。投标方须无条件配合、执行,并按照有关约定按期、保质的完成施工任务。对本项目工期要求的任一节点完成时间,中标单位每拖延一天,则应针对该节点承担违约金¥2000元/天处罚,招标方有权从当月进度款项中直接扣除。n2)要求中标单位在收到中标通知7天内上报详细的施工组织设计、施工进度计划(人、机、料等)分项技术方案和安全文明施工方案不按时报该计划中标方应支付招标方违约金2000元/天。n 3)由于现场施工作业面的限制,招标方可能不能一次性提交所有招标范围内作业面,投标单位须根据现场的实际情况,及时调整平面布置以及人、机、料的安排,以确保竣工日期目标的实现,中标方不应就此提出任何的工期及费用索偿。同时,招标方要求的总进度计划并不完全保证中标单位能按所定的进度计划连续不断的施工,假若因实际施工情况而需要对有关进度计划作出修改时,承包单位须予以配合及不能为此而作出任何的索赔。n 4)中标单位应在任何阶段与其他承包单位紧密配合,尤其是销售中心、入户大堂、电梯前室等等部位。同时,在整个施工过程中应按实际情况及考虑其他承包单位或专业承包单位的施工计划不断修订其工作进度计划以配合。如因中标单位未能按时完工,延误了其他相关施工单位的进场时间及机械人工的闲置,由中标单位负责向相关单位赔偿费用并给予2000到20000元处罚,造成节点工期滞后的由招标方按上述1)规定对中标单位进行处理;n5)中标单位需在中标后一个月内完成供电规划、供电方案报批报建;中标单位需在中标后一个月内完成配电图纸深化设计并取得政府职能部门(供电局)审查通过文件;因中标单位未能按时完工,中标方应支付招标方违约金2000元/天。","zbFanWei":"1.1招标文件清单n1)招标书、施工图纸、工程量清单;n2)招标人提供的《振业天成项目变配电深化设计图》。n3)招标人提供的由深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》。n1.2招标范围n1)招标图纸《振业天成项目变配电深化设计图》。n2)深圳市华阳国际工程设计股份有限公司设计的《振业天成项目施工图--电气专业》n具体详见招标文件。","ziZhiYaoQiu":"(1)投标人是在中华人民共和国境内注册并合法运作的独立法人机构或者其他组织,需提供营业执照的扫描件。n(2)投标人具有电力监管部门颁发的承装(修、试)电力设施许可证五级或以上资质,提供证书扫描件。n(3)投标人拟派本项目的项目经理应具有机电工程专业一级建造师资格证书,且无在建项目;特别提醒:投标文件项目经理必须在施工现场办公,并对整个项目施工全过程进行管控,不接受任何与投标文件不相符的项目经理。提供证书扫描件。n(4)投标人具有建设主管部门颁发的《安全生产许可证》,提供证书扫描件。 n(5)投标人2019年1月1日起至投标截止日止有承接过合同金额1000万元或以上新建住宅小区或商业变配电工程,提供体现上述内容的合同关键页扫描件,以合同签订日期为准,如合同无法证明规模或工程类型的,需补充提供其他证明材料,否则不予认可。n(6)本次招标不接受联合体投标。n(7)单位负责人为同一人或者存在控股、管理关系的不同单位,不得参加同一标段投标或者未划分标段的同一招标项目投标,否则相关投标均无效。n(8)投标人因违反工程建设法律法规和安全生产管理规定而受到建设行政主管部门红色警示的企业,在红色警示期间,或者近三年在政府诚信类平台有不良行为记录者,将不被接受参与本次投标工程投标,提供承诺函。","isJieShouLianHeTi":false,"jiaoYiLiuCheng":"1","gsjBaoJiaFangShi":1,"pbBanFa":2,"yaoQingFlag":1,"purchaseControlPriceExplain":,"purchaseControlFileList":,"isDuiWaiShowGsj":1,"bdHeTongGuJia":2863100000.00,"kaiBiaoXingShi":"1","zgsqWjOpenMethod":"1","zgsqWjSubmitMethod":"1","tbwjSubmitMethod":"1","isPayBaoZhengJin":1,"bzjJineBili":,"isPingDingFenLiUsed":1,"dbBanFa":10,"lianHeTiYaoQiu":"","jingJiaLeiXing":0,"yanShiFangShi":,"yanShiShiChang":0,"yanShiZongShiChang":0,"isQiPaiJiaExists":1,"qiPaiJia":0,"jiaGeTiDu":0,"isShowBaojia":,"isShowZuiDiJia":,"jingJiaXingShi":1,"isBiaoShuBianZhi":1,"jingJiaStartTime":,"jingJiaEndTime":,"sysPlatformCode":}]},"gc":{"gcName":"振业天成项目变配电及发电机工程","gcBH":"231UA1013471","xmLeiXing":0,"zbFangShi":1,"hangYe":"电力、热力、燃气及水生产和供应业","xmDiZhi":"黄埔军校小学旁、广汕公路以北HBPQ-A-6地块。","zbGkfw":"振业天成项目位于广州市黄埔区黄埔军校小学旁、广汕公路以北,总占地面积约52238㎡,总建筑面积约15万㎡,由10栋高层住宅、2层地下室及配套商业组成。高层建筑共10栋,为一类/二类高层住宅楼,地上共14~25层,地下2层,建筑总高度49.4~85.1m;结构形式为框架剪力墙结构。该项目将建设成为以居住功能为主、配套设施完善的现代住宅项目。","ziJinLaiYuan":1,"ziJinLaiYuanStr":,"zsFangShi":3,"performMethod":1,"zbZuZhiXingShi":2,"supplierSource":1,"zbrName":"广州市振业鸿远房地产开发有限公司","lianXiRenName":"郑镇财","lianXiRenPhone":"15820219534","zhuCeDiZhi":"广州市黄埔区科汇四街11号801房C11室","zbDLName":"深圳交易咨询集团有限公司","zbDLFuZeRenName":" 夏际、吴俞辉、陈嘉琪","zbDLZBFuZeRenPhone":,"zbDLZBFuZeRenMobile":"13922860757或0755-83500268、15019420586、18851178983","zbDLZBFuZeRenEmail":"1179502724@qq.com","zbDLAddress":"深圳市南山区沙河西路与白石路交汇处深圳湾科技生态园9栋B4座6楼","tenderProjectCode":,"fundSource":,"sysProjectCode":}},"code":1,"info":"查询成功","total":0,"pageCount":0}

返回顶部