招标
Announcement on the price inquiry and purchase of miscellaneous materials for the roadbed ancillary
金额
-
项目地址
-
发布时间
2024/06/05
公告摘要
项目编号-
预算金额-
招标公司-
招标联系人-
标书截止时间-
投标截止时间-
公告正文

 

2024 Malaysia East Railway Section 6 Roadbed Ancillary Engineering Project

Material inquiry and procurement bidding




Inquiry Announcement





Tender No.:    FA00000032140



Tenderer: CCCC Special Engineering Co., Ltd.

June 4 , 2024


2024 Malaysia East Railway Section 6 Roadbed Ancillary Engineering Project Material Inquiry and Procurement Tender Announcement

1 Bidding conditions

The construction materials used in the 2024 Madong Railway Sixth Division Roadbed Ancillary Project by China Communications Special Engineering Co., Ltd. have met the bidding conditions. Due to the tight construction period, the project has decided to conduct inquiry procurement in accordance with national laws and regulations and the material procurement management regulations of China Communications Special Engineering Co., Ltd. (hereinafter referred to as China Communications Special).

2 Project Overview and Bidding Contents

2.1 Project Overview

 The project site is located in Malaysia, the project type is maintenance and reinforcement, and the contract period is 10 months.

2.2 Bidding Content

For details of miscellaneous materials, please see Appendix 1 of the tender announcement.

3. Qualification requirements for suppliers responding to inquiries

3.1 Basic conditions

( 1) The enterprise must be strong and have a reliable and good credit status.

( 2) Having the capacity to independently bear civil liability.

( 3) Having good business reputation and sound financial accounting system.

( 4) Having the necessary equipment and professional and technical capabilities to perform the contract.

( 5) Have a good record of paying taxes and social security funds in accordance with the law.

( 6) There are no legal disputes or bad records in the three years before participating in the response to this batch of procurement inquiries, and there are no major violations of laws in business activities.

( 7) Other conditions prescribed by laws and administrative regulations.

( 8) Suppliers responding to inquiries must have a complete after-sales service organization and after-sales service system.

3.2 Specific conditions

( 1) The supplier responding to the inquiry shall guarantee that: the goods provided are manufactured by a legally established manufacturer and comply with relevant national industry standards; all contents of the inquiry documents submitted are true, legal and valid; the goods provided by the supplier responding to the inquiry shall comply with the technical requirements of the inquiry and the inquiry response documents and have no defects in title; otherwise, the supplier shall bear all losses and related liabilities caused to the purchasing unit.

( 2) Consortium quotations will not be accepted.

4. Submission of bidding documents and bid opening

4.1 The Purchaser will publish a price inquiry notice through the CCCC Supply Chain Information Management Information Platform on June 5, 2024. Units interested in bidding are requested to respond within the above date (website: http://ec.ccccltd.cn/PMS) .

5. Submission of Inquiry Response Documents

5.1 The deadline for submitting the inquiry response document is: June 13 , 2024 Before 15:00 . The person who responded to the inquiry shall submit the inquiry response document to the Subsidiary Engineering Project Department of the Sixth Branch of the Madong Railway .

5.2 If the successful inquiry response document is not submitted within the deadline, the procurement tenderer will not accept it.

6. Contact Information

Tenderer : CCCC Special Engineering Co., Ltd.

Address : 20th Floor, Block A, Hubei Science and Technology Entrepreneurship Building, No. 34, Xiaohongshan East District, Wuchang District, Wuhan

Contact : Hu Jiping Tel: 0135575688

 Zou Zhuo Phone: 01112351669

E-mail: zz642723536@gmail.com

June 2 , 2024

Appendix 1 Bidding Materials

Serial number

content

Specifications

unit

quantity

1

White tape


roll

2

2

Non-threaded fasteners


indivual

4

3

PVC thick pipe

20mm

root

12

4

Hacksaw frame

12"

indivual

1

5

PVC pipe head


indivual

3

6

drill

12mm

indivual

1

7

PVC elbow

20mm

indivual

7

8

PVC tank joint

20mm

indivual

1

9

Brass elbow

0.5"*0.75"

indivual

3

10

PVC pipe socket

20mm

indivual

2

11

Working hammer


Bundle

1

12

screw


indivual

1

13

PVC nut box

3*3

indivual

2

14

PVC direct pipe

7m*20mm

indivual

2

15

PVC elbow

25mm

indivual

1

16

PVC Transformer


indivual

1

17

PVC tank joint

25mm

indivual

1

18

Single switch


indivual

1

19

Socket Box


indivual

1

20

Suspenders

2t*3m

root

2

twenty one

Fiber measuring tape

50m

indivual

1

twenty two

marker


branch

12

twenty three

Cutting disc

14"

piece

10

twenty four

Straight crowbar


root

1

25

Bent crowbar


root

1

26

Plastic trowel


Bundle

4

27

Iron trowel


Bundle

4

28

Buckle


indivual

2

29

Ash bucket


indivual

10

30

Industrial white zinc


kg

25

31

Cutting Machine


tower

1

32

Rattan handle octagonal hammer

8LB

Bundle

2

33

Rattan handle octagonal hammer

4LB

Bundle

2

34

Woodworking Line


roll

10

35

Welding tongs


Bundle

1

36

socket


indivual

2

37

Fire extinguisher

Dry powder

indivual

2

38

switch

16A

indivual

3

39

Junction Box


indivual

1

40

safety shoes


pair

1

41

helmet


indivual

8

42

Reflective vests


Item

11

43

Industrial garbage bags


Bag

10

44

PVC water pipe

80mm

root

1

45

PVC connector

75mm

indivual

2

46

Steel tape

30m

Bundle

1

47

PVC water pipe

75mm

branch

2

48

Connectors

80mm

indivual

10

49

White ash


bag

19

50

Safety shoes


pair

20

51

Warning tape


roll

2

52

Green reflective vest


Item

2

53

Plywood

12mm4'*8'

open

65

54

Wood

2"*2"*8'

branch

2200

55

Color steel tile

4 meters

open

10

56

water pipe

75mm

branch

2

57

pipe connector

80mm

indivual

10

58

Hoe handle


Bundle

60

59

Engine Oil

24L

bucket

3

60

Electric fan


tower

1

61

Water tank


indivual

2

62

Fire extinguisher

9KG

indivual

4

63

Clamp


indivual

2

64

Water pipe elbow

25mm

indivual

4

65

pipe connector

20*25mm

indivual

1

66

Electric pick chisel

17*450mm

indivual

4

67

Iron wire


KG

40

68

Concrete grinding disc


piece

5

69

pipe connector

32mm

indivual

20

70

raincoat

x

set

45

71

Cutting Machine

355mm/14'

tower

450

72

Cutting disc

14''*355mm*2.5mm

piece

10

73

Plastic template buttons


indivual

10000

74

Square Steel

5*7.5*2.3

root

104

75

Color steel tile

3.3 m

piece

530

76

Color steel tile

2.9 m

piece

800

77

tube

PVC1/2

root

60

78

Tee

PVC1/2

indivual

50

79

elbow

PVC1/2

indivual

110

80

direct

PVC1/2

indivual

200

81

Pistol drill


Bundle

2

82

Electric drill


Bundle

2

83

Self-tapping


box

5

84

Oil barrel

1000L

indivual

3

85

Oil pump


indivual

1

86

plastic barrel

4000L

indivual

4

87

PE pipe

φ50mm*100m

roll

1

88

direct

PE50mm

indivual

6

89

elbow

PE50mm

10

90

Head Change

PE50mm*30mm

2

91

Ball valve

32mm

10

92

direct

32mm

10

93

elbow

32mm

10

94

Tee

32mm

12

95

PE pipe to PVC

32mm*3/4

12

96

Ball valve

PVC1/2

indivual

50

97

Female thread connector

PVC1/2

indivual

50

98

Faucet


indivual

50

99

Water Pump


tower

1

100

glue


bottle

10

101

Hand saw


Bundle

1

102

Generator tray

3mm*1000*700

indivual

5

103

Squat Toilet + Repulse Bay


set

38

104

Flusher + pipe


set

40

105

Urinal


set

6

106

White tube

100mm

root

20

107

White tube

160mm

root

20

108

elbow

100mm

indivual

10

109

Tee

100mm

indivual

40

110

Reducing elbow

160mm*100mm

indivual

17

111

Reducing Tee

160mm*100mm

indivual

twenty one

112

Tee

160mm

indivual

15

113

elbow

160mm

indivual

4

114

cement


Bag

40

115

brick


Trust

4

116

sand


ELA

2

117

Wood formwork

18mm*4"*8"

piece

400

118

dynamo

7kw

tower

3

119

Gloves


pair

1020

120

nail

2 inches

box

54

121

iron wire


Kilogram

150

122

Sledgehammer

8 lbs

Bundle

15

123

Hammer

4 lbs

Bundle

20

124

electric wire

5 cores*4mm*200m

roll

2

125

electric wire

2 cores*2.5mm*500m

roll

2

126

Explosion-proof plug

mother

indivual

10

127

Explosion-proof plug

male

indivual

40

128

Hand saw


tower

5

129

Cutting disc

14"

box

4

130

Impact drill


tower

5

131

Electric drill bit


root

50

132

Twist Drill

16*210mm

root

100

133

tape measure

5m

Bundle

50

134

tape measure

7.5m

Bundle

25

135

Construction Line


roll

600

136

Marker pen


branch

60

137

Crowbar

600mm

root

20

138

hoe


Bundle

50

139

shovel


Bundle

50

140

Pickaxe


Bundle

50

141

Cutting disc

7"

piece

20

142

Plastic foam board


piece

10

143

Rain boots


pair

16

144

plastic film

9"*20"

roll

20

145

Oil barrel


indivual

2

146

bucket

5000L

indivual

2

147

Black garbage bag


Bag

10

148

iron wire


kg

8.4

149

Sledge Hammer


Bundle

3

150

Claw Hammer

27mm

Bundle

5

151

PVC pipe

75mm*5.8m

root

9

152

Expansion bolts

1/2*4''

box

3

153

tape

50m

indivual

1

154

Saw Blades

4''*40T

piece

25

155

nail

3'

box

3

156

Lamp tube light stand


set

12

157

Switch Plate


indivual

12

158

Socket strip


indivual

twenty two

159

Bottom box

3*3

indivual

34

160

Cable Ties


Bag

2

161

Electrical tape


roll

26

162

leakage protector

63A

indivual

10

163

Tube

2*2.8mPE

root

9

164

elbow

2 inches

indivual

20

165

direct

2 inches

indivual

10

166

Tee

2 inches

indivual

10

167

Raw tape


roll

30

168

Male thread connector


indivual

10

169

garbage can

240L

indivual

8

170

cement brick


Trust

2

171

Claw Hammer


Bundle

30

172

hose

12 inches

root

30

173

Vibrator


root

10

174

Three-way explosion-proof plug

Three holes

indivual

15

175

Three-way explosion-proof plug

Four holes

indivual

5

176

Square Steel

2*2*2.3mm

root

682

Part 2 Instructions for Bidders

Information Sheet for Bidders

project

content

1

Name of the Tenderer: CCCC Special Engineering Co., Ltd.

Address: Wuhan City, Hubei Province

Contact: Hu Jiping Tel: 0135575668

Zou Zhuo Tel: 01112351669

2

Project Name: Madong Railway Section 6 Roadbed Ancillary Engineering Project

3

skills requirement:

none

4

1 day from the deadline for submission of quotation document

5

Quoted guarantee amount: 0 million.

6

Number of quotation documents: 1 copy.

7

Address for submitting quotation documents: Madong Railway Sixth Branch Roadbed Auxiliary Engineering Project Department

8

Deadline for quotation documents : 15:00 on June 13 , 2024 .

9

Time and method of bid opening: The bidder shall open the bids on its own.

10

Advance payment: None . The successful bidder is not required to provide a bank guarantee of the same amount.

11

Evaluation rules: Evaluation by the lowest bid price method

12

Tentative delivery period: 30 calendar days

13

Settlement payment ratio: (see Measurement, payment and settlement methods for details);

14

Performance bond: None

15

The quality deposit withholding ratio is 0 % .

16

7 days after the successful bidder receives the notice of winning the bid .

17

Supervisory body: CCCC Special Engineering Co., Ltd.

Tel: 027-87262017

21F , Block A , Hubei Science and Technology Entrepreneurship Building, No. 34 , Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, China Postal Code: 430071


Instructions for Bidders

一、 skills requirement

1、Bidders should strictly carry out processing and production in accordance with the technical requirements provided by the tenderer and the specifications and standards issued by the state .

二、 Request a quote

1. Composition of unit price excluding tax: The unit price excluding tax is the price excluding value -added tax . The unit price includes material rental fees (including necessary accessories and spare parts), warehouse fees, product maintenance fees, service fees, management fees, profits, interests, acceptance discounts, non-value-added tax, milling fees and all express and implied fees.

2. Tax rate: refers to the deductible tax rate of the special value-added tax invoice with legal effect issued by the bidder. The tax rate will remain unchanged during the execution of this contract.

3. Unit price formation mechanism: Fixed unit price. The bidder promises that during the contract period, the unit price, freight, management fees, taxes and profits will not be affected by market factors, and the quality of material supply will not be affected.

4. Quantity Agreement: The quantities listed in this contract are provisional quantities. The increase or decrease in the settlement quantity will not affect the execution of other terms of this contract. The quantity is subject to actual settlement.

三、 Measurement, payment and settlement methods

1. The actual delivery acceptance quantity (counting or weighing weight, etc.) shall be the basis, including tax, and the goods shall be picked up and accepted by the bidder and delivered to the delivery location.

2. Document acceptance: The documents that the bidder must provide include delivery note and certificate of conformity.

3. Quality acceptance: Preliminary inspection of the appearance of materials to ensure that they are of qualified quality. Receipt of goods does not mean that the tenderer agrees that the tenderer's materials are of qualified quality.

4. Payment method: Cash

5. Payment: The bidder shall pay Party B 100% of the purchase price of the batch of materials within 90 days from the date when the tenderer completes the settlement procedures.

6. When the tenderer pays the bidder for material purchases, the bidder must provide the tenderer with a formal invoice issued by the tax authority, or the tenderer must withhold and pay taxes on behalf of the bidder and issue a tax invoice, and the withheld amount will be deducted from the material payment.

7. The withholding and payment of the quality deposit does not relieve the bidder from the responsibility of ensuring the quality of the delivered goods .

8. Settlement period: Settlement will be made within 3 months after the goods arrive at the site and are signed for and accepted by the tenderer .

Settlement basis: The bidder shall summarize the "Site Acceptance Form" (format provided by the tenderer) signed by the tenderer and the "Exit Acceptance Form" signed after exiting the site, and submit them to the tenderer for the material receipt settlement form.

9. The bidder shall issue and deliver the compliant full amount (special value-added tax invoice) to the tenderer for accounting within 7 working days after the settlement based on the current settlement statement ; after the tenderer further reviews or certifies the invoice, it shall pay the bidder in accordance with the contract agreement .

四、 Eligibility criteria for bidders

1. The bidder must be an entity that holds the corresponding production qualification certificate and has undertaken similar projects .

2. The bidder should have the experience, technical strength and ability to undertake similar projects.

3. The bidder should participate in the quotation alone.

五、 Signing of quotation documents

The quotation document shall be printed in writing and signed by the legal representative of the bidder or his authorized person. No page of the quotation document shall be altered, inserted between lines or deleted.

Special note: The signature should be clearly legible, otherwise the quotation will be invalid.

六、 Tagging of quotation documents

The quotation document shall be stamped with the official seal of the unit.

七、 Composition of the quotation document

1.    auction letter

2.    Quotation list (prepared in the format of "List")

八、 something else

1. All expenses incurred by the bidder during the bidding period shall be borne by the bidder . The tenderer will select one or more bidders based on the bids and after comprehensive evaluation and assessment. The tenderer will not make any explanation to the bidders that fail to win the bid.

2. The bidder must promise that the bidder shall be the main manufacturer of the product , fully respond to the contract terms, sign a contract with the tenderer, and assume corresponding legal responsibilities.

3. After receiving the notice of winning the bid, the bidder should immediately prepare the order for materials and transport them to the designated construction site within 30 days to meet the construction progress requirements .


Quotation

To: CCCC Special Engineering Co., Ltd.

1. After studying your inquiry document, we are willing to quote in Ringgit (indicate the total price) for the miscellaneous materials in the roadbed ancillary engineering project of the sixth section of the East Coast Railway .

2. If your company accepts our quotation, we will ensure that we will start supplying materials within the time specified by you after signing the contract and complete the supply of machinery and materials within the period specified in the contract.

3. We agree to strictly abide by the commitments in this quotation within the 3- day validity period of the quotation document. Before the expiration of this period, this quotation will always be binding on us and we can accept the winning bid at any time.

4. Before the contract agreement is formally signed and takes effect, this quotation together with your winning notice will constitute documents to be complied with by both parties and will be binding on both parties.

5. We understand that you are not necessarily willing to accept the lowest bid or any other bid you receive. We also understand that you will not bear any of our quotation fees and you may select multiple bidders at the same time.

6. We hereby declare that the documents and information submitted in this quotation are complete, true and accurate in all aspects, and we shall bear the legal responsibility for it.

Bidder's Address: Postal Code:

telephone / fax:


Bidder: (Seal)

Legal representative or his authorized agent: (Signature)

Date: Year Month Day



一、Quotation Documents

Amount unit: Yuan

Serial number

Material Name

Specifications

unit

quantity

freight

(Yuan)

Acceptance discount (yuan)

Unit price including tax (Yuan)

Total price including tax (yuan)

Supply cycle

Remark

1

Remark:

1、The quantity, specifications and models of the above materials may be adjusted during the implementation stage. The final quantity, specifications and models, and procurement time shall be subject to the supply order issued by the tenderer;

2、Price risk and how to bear it: The unit price is the above comprehensive unit price, including all costs such as material procurement costs, packaging fees, taxes, acceptance interest subsidies, etc.

3、Technical standards: Materials shall be subject to the requirements of the tenderer;



返回顶部