Concrete Materials Testing Service for Philippine Pasay Reclamation Development Project (Phase 1) Hydraulic Engineering
(Bildding No.:201SM-SG-060)
Tender Notice
TO all tenders:
1. Concrete Materials Testing Service for this project has met the tender conditions and is now open for public tender, using electronic tendering and bidding methods. Please log in to Supply Chain Management System of CCCC (http://ec.ccccltd.cn) to complete registration. Please remember the registered username and password.
2.Please download the bidding document through the remote login of Supply Chain Management System of CCCC (http://ec.ccccltd.cn) from Octorber 12 ,2024 at 12:00 PM to Octorber 17 ,2024 at 1200 PM .
3.Bid Documents should be submitted from Octorber 17 ,2024 at 12:00 PM to Octorber 22,2024 at 12:00 PM. The tender shall upload the prepared electronic version of the bid document to Supply Chain Management System of CCCC(http://ec.ccccltd.cn).
4.It shall remain your responsibility to ensure that your bid documents will reach the address above on or before the deadline. Bid Documents that are received by CHEC after the deadline indicated above, for whatever reason, shall not be considered for evaluation.
5.We kindly look forward to your submission of bid documents for Concrete Materials Testing Service, thank you for your cooperation.
Please take note of the following requirements and conditions pertaining to the supply of the mentioned services above:
Tenderee |
CHINA HARBOUR ENGINEERING COMPANY |
Function: |
Concrete Materials Testing Service for Philippine Pasay Reclamation Development Project (Phase 1) Hydraulic Engineering |
Location of Service |
Manila Bay |
Project Description |
Please refer to Annex 1 |
Testing items |
Please refer to Annex 1 |
Rate |
Fixed unit price contracts |
Currency of Quotation |
PHP (Philippines peso) |
Address of Tender |
Supply Chain Management System of CCCC(http://ec.ccccltd.cn) |
Deadline for the Submission of Quotation |
FROM 17 Octorber ,2024 at 12:00 PM to 22 Octorber 2024 at 12:00 PM |
Language |
English |
Documents to Be Submitted |
l Business permit or SEC/DTI; l BIR 2303; l Contact Person ID scanned copy l Annex 1: Priced bill of quantities. |
Period of Validity of Quotes Starting from the Submission Date |
60 days. |
Payment Terms |
Remittance by bank |
Currency |
PHP (Philippines peso) |
Evaluation Criteria |
Experience, responsiveness/Full compliance to requirements and lowest price [1] |
CHEC Will Award to: |
One business firm who meets the requirements |
Contractual Period |
To be confirmed |
The Maximum Bid Price |
Package1:PHP 9,574,091.52(including taxes). The tax rate is 12%. Package2:PHP6,177,600(including taxes). The tax rate is 12%. Any bid exceeding the maximum bid price will be considered invalid. |
Annexes to This RFQ |
Please refer to Annex 1 |
Contact Person for Inquiries [2]
|
Attention: WANG (Cell: 9603891809) E-mail address:527400996@qq.com |
Services offered shall be reviewed based on completeness and compliance of the quotation with the minimum requirement described above and any other annexes providing details of CFHEC requirements.
【1】CHEC reserves the right not to award the contract to the lowest priced offer, if the second lowest price among the responsive offer is found to be significantly more superior, and the price is higher than the lowest priced compliant offer by not more than 10%, and the budget can sufficiently cover the price difference. The term “more superior” as used in this provision shall refer to offers that have exceeded the pre-determined requirements established in the specifications.
【2】This contact person and address is designated by CHEC. If inquiries are sent to other person/s or address/es, even if they are CFHEC staff, CFHEC shall have no obligation to respond nor can CFHEC confirm that the query was received.
The quotation that complies with all the requirements and offers the lowest price, as well as all other evaluation criteria indicated, shall be selected. Any offer that does not meet the requirements shall be rejected.
Any discrepancy between the unit price and the total price (obtained by multiplying the unit price and quantity) shall be re-computed by CHEC. The unit price shall prevail, and the total price shall be corrected. If the supplier does not accept the final price based on CHEC’s re-computation and correction of errors, its quotation will be rejected.
CHEC is not bound to accept any quotation, nor award a contract/Purchase Order, nor be responsible for any costs associated with a Supplier’s preparation and submission of a quotation, regardless of the outcome or the manner of conducting the selection process.
CHEC implements a zero tolerance on fraud and other proscribed practices and is committed to identifying and addressing all such acts and practices against CHEC.
Thank you and we look forward to receiving your bid documents.
Sincerely yours